Thursday, January 9, 2020

Proposed Sustainability Measures By Retrofitting Optimum...

Executive Summary University of Technology, Sydney is university located near the heart of the Sydney City Centre. The establishment of the institution traces back to the 1870s and currently has four campuses with several buildings and facilities within the campuses. UTS currently owns the land and the existing building located at 720 Harris Street Ultimo Sydney. With works commencing around mid to late 2015, UTS plans to take on board and implement sustainability measures by retrofitting optimum sustainable development. With this consideration in mind, UTS however, is uncertain on the aspects they wish to implement as retrofit works which is why they are seeking professional advice to explore sustainable options and better understand the optimum sustainability measures in the development with whole life cycle in mind. This report, outlines a certain sustainable retrofitting option and explores deeply on the criteria it will target, the outcomes and the long term benefits for the building of the unive rsity. Table of Contents Executive Summary 1 Introduction 3 Building Portfolio 3 Sustainable Building Model Assessment 4 Sustainable Procurement 4 Planning and Regulatory Constraints 5 Sustainable Procurement Options 5 Short, Medium and Long Term Plain Targets 7 Current Environment and Future Effects Due to Proposed Changes 8 Recommendation 8 References 9 Introduction When a building’s infrastructure integrates scheme, construction and functional practices thatShow MoreRelatedDemand Side Management22653 Words   |  91 PagesModule 14 Demand-side management sustainable energy regulation and policymaking for africa MODULE 14: DEMAND-SIDE MANAGEMENT page iii CONTENTS 1. MODULE OBJECTIVES 14.1 1.1. Module overview 14.1 1.2. Module aims 14.1 1.3. Module learning outcomes 14.2 2. INTRODUCTION 14.3 3. WHY PROMOTE DSM? 14.5 4. WHAT DRIVES DSM? 14.7 4.1. Cost reduction and environmental motives 14.8 4.2. Reliability and network motives 14.10 5. TYPES OF DSM MEASURES 14.13 5.1. Energy reduction programmes 14Read MoreProject Mgmt296381 Words   |  1186 PagesActivity duration estimates (.3) 6.4.2 Estimating tools (.1.3.4) 6.3.1 Identifying resources 7.1 Activity cost estimates (.2.3.4.5) 5.1.2.4 Delphi method Chapter 6 10.5.3 Cost/schedule system (.1) 6.6 .2.1 Time performance 7.2.3.1 Cost baseline development 7.3.2.1 Earned value system (F.4) 7.3.2.4 E.V., performance status report 7.3.2.2 E.V., forecasts 7.3.2.3 EV., to complete index (EAC) 7.3.2.5 Schedule and cost variance Developing a Project Plan 4.2.2 Planning tools 6.2 Sequence activities

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.